Seitenbereiche:

Application advice for Christmas tree plantations

For conventional farming For organic farming

For conventional farming

New planting

Application rate per ha
100 l water
1 l AKRA Saat-Power  

Tips

  • Leave seedlings in the solution for at least 8–12 hours (for bare root plants after root pruning)
  • Leave potted plants in the solution for 2 minutes

Fertilisation

Application rate per ha
150 – 400 kg AKRA Kombi
AKRA DGC depending on fractional soil analyses 

Application time
Spring or autumn

Bud spraying

Application rate per ha
400 l water
1% AKRA WD
Wetting agent 

With weevil/mite infestations
400 l water
2% AKRA Sulpur+
2% AKRA WD
Wetting agent 

Tips
• Minimum 8 hours without frost
• Drench trees

Bud fertilisation

Application rate per ha
1000 l water
1 l AKRA Plus 9
4 l AKRA Blatt
4 l AKRA MSB
1 l AKRA Azotobacter
2 l AKRA Sulpur+
1 l AKRA WD
Wetting agent

Application time
• End of bud-swell phase
• Once new shoots have lignified (watch out for pests)
• Application time - afternoons

Additional information

  • The pH value of the spray solution should be adjusted to 5.5 with citric acid.
  • The addition of AKRA foliar fertiliser can and may reduce the pH value of the spray solution.
  • Mix in any other products individually once the pH value has been adjusted.
  • Make sure that you add the additional products in the right order.
  • The dosage of AKRA foliar fertiliser must be adjusted to the quantity of water used.

For organic farming

New planting

Application rate per ha
100 l water
1 l AKRA Saat-Power  

Tips: 

  • Leave seedlings in the solution for at least 8–12 hours (for bare root plants after root pruning)
  • Leave potted plants in the solution for 2 minutes

Fertilisation

Application rate per ha
150 – 400 kg AKRA Kombi
AKRA DGC depending on fractional soil analyses 

Application time
Spring or autumn

Bud spraying

Application rate per ha
400 l water
1% AKRA WD
Wetting agent 

With weevil/mite infestations
400 l water
2% AKRA Sulpur+
2% AKRA WD
Wetting agent

Tips
• Minimum 8 hours without frost
• Drench trees

Bud fertilisation

Application rate per ha
1000 l water
1 l AKRA Plus 9
4 l AKRA Blatt
4 l AKRA MSB
1 l AKRA Azotobacter
2 l AKRA Sulpur+
1 l AKRA WD
Wetting agent 

Application time
• End of bud-swell phase
• Once new shoots have lignified (watch out for pests)
• Application time - afternoons

Additional information

  • The pH value of the spray solution should be adjusted to 5.5 with citric acid.
  • The addition of AKRA foliar fertiliser can and may reduce the pH value of the spray solution.
  • Mix in any other products individually once the pH value has been adjusted.
  • Make sure that you add the additional products in the right order.
  • The dosage of AKRA foliar fertiliser must be adjusted to the quantity of water used.

Product information

BACK TO TOP